Zuo Fei and Zhang K. (2018). Selection of risk response actions with consideration of secondary risks. International Journal of Project Management, 36(2), 241-254. (中科院一区TOP,IF=9.2)
Zuo Fei, Zio E. and Yuan Y. (2022). Risk-Response strategy optimization considering limited risk-related resource allocation and scheduling. Journal of Construction Engineering and Management, 148(11), 04022. (中科院二区,IF=5.2)
Zuo Fei and Zio E. (2024). Managing Secondary Risks with Optimal Risk Response Strategy and Risk-related Resource Scheduling. Reliability Engineering & System Safety, 110028. (中科院一区TOP,IF=8.1)
Zuo Fei, Zio E. and Xu Y. (2023). Bi-objective optimization of the scheduling of risk-related resources for risk response. Reliability Engineering & System Safety, 237, 109391. (中科院一区TOP,IF=8.1)